The Plymouth Avenue GLS land parcel was announced in the 2H2026 GLS Programme, under the Reserve List.
The land parcel is the former site of the Raffles Town Club, which under a joint statement from SLA and URA in Nov 2023, earmarked the plot for future residential development when its lease ends on Oct 17, 2026 and will have to vacate the premises.
This plot is located directly opposite Stevens MRT Interchange just across the road, which is an interchange station between Downtown and Thomson-East Coast Line.
It is also located directly beside the Singapore Chinese Girls' School.
The Plymouth Avenue GLS land parcel was announced in the 2H2026 GLS Programme, under the Reserve List.
The land parcel is the former site of the Raffles Town Club, which under a joint statement from SLA and URA in Nov 2023, earmarked the plot for future residential development when its lease ends on Oct 17, 2026 and will have to vacate the premises.
This plot is located directly opposite Stevens MRT Interchange just across the road, which is an interchange station between Downtown and Thomson-East Coast Line.
It is also located directly beside the Singapore Chinese Girls' School.



Credit : Streetdirectory.com


The Plymouth Avenue GLS Land Parcel is bounded by Plymouth Avenue to the west, Dunearn Road to the south and Whitley Road to the east. The site is in an established residential neighbourhood, comprising low-density condominium developments and the Dunearn landed housing estate within the Novena Planning Area.
Located near the existing Stevens Mass Rapid Transit (“MRT”) interchange station on the Downtown Line and Thomson-East Coast Line, the site is designated for a Residential with Commercial at 1 st Storey development. Future residents can enjoy good public transport accessibility and easy access to the city centre. Amenities such as Singapore Chinese Girls’ School, St. Joseph’s Institution, Tanglin Community Club and Malcolm Park are all within easy reach.
A summary of the planning and urban design requirements:


The Land Parcel is to be developed for a Residential with Commercial at 1 st Storey development. The maximum permissible GFA for the proposed development is 23,914 m 2 and the total GFA to be built is not to be less than 21,523 m2 .
The proposed residential development shall be for Flats only. Condominium, Serviced Apartments, Serviced apartments II (SA2) and Strata landed houses are not allowed.
A maximum of 2,500 m 2 of the total GFA of the development may be developed for the following commercial uses at the 1 st storey to serve as amenities for residents:
Office and commercial uses such as bar/pub, massage establishment, amusement centre, and any live entertainment use etc. that may result in dis-amenity to residents are not allowed within the development.
Any additional GFA, over and above the maximum permissible GFA specified for the proposed development and accrued from incentive GFA schemes will be subject to the prevailing Development Control Guidelines and the approval of the Competent Authority under the Planning Act. This additional GFA may be subject to the payment of Land Betterment Charge, if applicable.
Activity-Generating Uses (AGU) such as shops, restaurants, fitness centres etc. are to be provided at the 1 st storey of the development fronting Dunearn Road, Whitley Road and the common boundary with ‘The Trevose’. The AGUs shall serve as amenities to the residents and surrounding developments, and create an active frontage along Dunearn Road and Whitley Road. Uses that could potentially generate dis-amenity such as noise and crowd to residential areas (e.g. Restaurants, Outdoor Refreshment Areas etc.) are not to be located along the common boundary with ‘The Trevose’.
The whole development, including the commercial uses and all public spaces incorporated within the development (e.g. covered walkways and pedestrian linkways as shown on the Control Plan), but excluding the GFA for flats use and common property related to flats use, shall be held under a single strata lot.
The share value applicable to each strata lot is subject to the approval of the Commissioner of Buildings under the Building Maintenance and Strata Management Act.
The overall design of the building should take into consideration the maintenance accesses required by the respective owners, arising from the strata sub-division.
The proposed development is subject to specific building height controls which are established to guide the proposed development to better relate to the surrounding developments and the site context. These building height controls are set out below and as shown in the Building Height Plan:
The proposed development shall comply with the setback requirements in accordance with the prevailing Development Control Guidelines.
Minor ancillary structures, e.g. guardhouse, may be allowed within the building setback areas and green buffer, subject to the Objective-Based Guidelines for Ancillary Structures in the URA Development Control Handbook. Minor ancillary structures, if provided, are to be well designed and well-integrated with landscaping.
Open Landscaped Walkway
The development shall include a minimum 6m wide open landscaped walkway along the common boundary with ‘The Trevose’, as shown in the Control Plan, based on either of the following options:
a. Option 1: Retain the existing covered linkway abutting ‘The Trevose’.
The minimum 6m wide open landscaped walkway shall be provided next to the existing covered linkway.
b. Option 2: Remove the existing covered linkway abutting ‘The Trevose’ partially. The minimum 6m wide open landscaped walkway shall be provided from the common boundary with ‘The Trevose’.
The open landscaped walkway shall include a minimum 2m wide planting strip with one row of trees, and shall be owned and maintained as part of the proposed development by the Successful Tenderer and the future owner of the single strata lot.
The development shall be fenceless on the 1 st storey to ensure visual and physical porosity to facilitate pedestrian movement to and from the AGUs and covered walkways. Boundary walls, fences or physical barriers are not allowed. Any access controls must be well-integrated with landscaping or architecture to maintain visual openness and public accessibility.
1st Storey Covered Walkways
The development is to provide continuous covered walkways at the 1st storey within the building envelope fronting Plymouth Avenue, Dunearn Road, Whitley Road and the common boundary with ‘The Trevose’, as shown indicatively on the Control Plan. The proposed covered walkways shall have a minimum width of 3.6m (and minimum clear internal width of 3.0m) and a maximum soffit height of 3.6m for effective weather protection.
The development is to provide covered linkways to connect to existing covered linkways and sheltered pedestrian waiting area within and around the Land Parcel as shown on the Control Plan, and set out below:
a. Control Plan (Option 1) – The existing covered linkway abutting ‘The Trevose’ is to be retained as-is. The development is to provide covered linkways with a minimum width of 2.4m (and minimum clear internal width of 1.8m) to connect the existing covered linkway to the proposed covered walkway at the 1 st storey of the development to ensure fully sheltered, barrier-free connectivity to the existing bus stop along Whitley Road.
b. Control Plan (Option 2) – The existing covered linkway abutting ‘The Trevose’ can be retained partially. The development is to provide a covered linkway with a minimum width of 2.4m (and minimum clear internal width of 1.8m) to connect the retained section of the existing covered linkway to the proposed covered walkway at the 1 st storey of the development. An additional covered linkway with the same specifications is to be provided and connected to the proposed covered walkway at the 1 st storey of the development fronting Plymouth Avenue.
c. Connection to existing covered linkways and sheltered pedestrian waiting area along Dunearn Road – A portion of existing covered linkway outside the Land Parcel (within the Road Reserve) as shown indicatively on the Control Plan is to be retained. The proposed development is to provide covered linkways with a minimum width of 2.4m (and minimum clear internal width of 1.8m) to connect the retained section of the existing covered linkway to the proposed covered walkway at the 1 st storey of the development fronting Dunearn Road.
Vehicular Access
Vehicular access shall be taken from Plymouth Avenue, as shown indicatively in the Control Plan. The detailed proposal for the vehicular access point and traffic layout plans will be subject to the requirements and approval of the Authority, LTA and the relevant Competent Authorities at the formal submission stage and the requirements are as set out in Section 7.0 of the Conditions and Requirements of Relevant Competent Authorities and Public Utility Licensees.
The Successful Tenderer shall at his own cost and expense, construct covered linkways connecting the proposed covered walkway at the 1st storey of the development to the existing covered linkways along Dunearn Road and along the common boundary with ‘The Trevose’, as shown indicatively in the Control Plan and described in Conditions 4.12.3 to 4.12.7 above, and as set out in Section 7.0 of the Conditions and Requirements of Relevant Competent Authorities and Public Utility Licensees.
PRESS COVERAGE
27 October 2026
The Urban Redevelopment Authority (URA) has released two residential sites at Chuan Grove and Plymouth Avenue/Dunearn Road for sale today under the second half 2026 (2H2026) Government Land Sales (GLS) Programme.
The sites at Chuan Grove and Plymouth Avenue/Dunearn Road are available for application under the Reserve List and can potentially yield about 930 and 250 residential units, respectively. Details on the two sites:

(1) Chuan Grove GLS Plot 3, Plymouth Avenue/Dunearn Road
(2) Final site area is subject to cadastral survey.
(3) A maximum GFA of 2,500 m2 for commercial use, including a supermarket of at least 1,000 m2 , is stipulated for the site.
(4) The actual number of housing units provided by the developer may vary.
PRESS COVERAGE
3 June 2026
1 The Government has announced the GLS Programme for 2H2026. Comprising nine Confirmed List sites and 13 Reserve List sites, the Programme can yield 9,200 private residential units, 188,100 sqm gross floor area (GFA) of commercial space and 970 hotel rooms (see Appendix 1 [PDF, 283kb] and Appendix 2 [PDF, 148kb]).
2 The Confirmed List, which comprises eight private residential sites and one White site, can yield 4,745 private residential units (including 735 EC units) and 83,350 sqm GFA of commercial space.
3 The Reserve List comprises eight private residential sites, one commercial site, two White sites and two hotel sites, which can potentially yield an additional 4,455 private residential units, 104,750 sqm GFA of commercial space, and 970 hotel rooms.
| S/N | Location | Site Area (ha) | Proposed GPR | Estimated No. of Residential Units | Estimated No. of Hotel Rooms | Estimated Commercial Space (m2) | Estimated Launch Date | Agency |
|---|---|---|---|---|---|---|---|---|
| Reserve List | ||||||||
| Residential Sites | ||||||||
| 1 | Cross Street (8) | 0.23 | 6.3 | 315 | 0 | 500 | Available | URA |
| 2 | Media Circle (Plot 2) (9) | 0.57 | 4.2 | 520 | 0 | 400 | Available | URA |
| 3 | Media Circle (Parcel B) (10) | 1 | 4.3 | 500 | 0 | 400 | Available | URA |
| 4 | Morrison Lane (11) | 0.66 | 2.8 | 205 | 0 | 500 | Available | URA |
| 5 | Kitchener Link | 0.42 | 3 | 145 | 0 | 0 | Jun-26 | URA |
| 6 | Serangoon North View (3) | 0.8 | 2.5 | 235 | 0 | 0 | Sep-26 | URA |
| 7 | Chuan Grove (Plot 3) (3) | 3.18 | 2.5 | 935 | 0 | 0 | Oct-26 | URA |
| 8 | Plymouth Avenue/Dunearn Road (3)(12) | 1.14 | 2.1 | 250 | 0 | 2,500 | Oct-26 | URA |
| Commercial Sites | ||||||||
| 9 | Punggol Walk (13) | 1 | 1.4 | 0 | 0 | 13,350 | Available | URA |
| White Sites | ||||||||
| 10 | Marina Gardens Crescent (14) | 1.73 | 4.2 | 775 | 0 | 6,000 | Available | URA |
| 11 | Woodlands Avenue 2 (15) | 2.75 | 4.2 | 440 | 0 | 78,000 | Available | URA |
| Hotel Sites | ||||||||
| 12 | River Valley Road (16) | 1.02 | 2.8 | 0 | 530 | 2,000 | Available | URA |
| 13 | Telok Ayer Street (17) | 0.41 | 7 | 135 | 440 | 1,100 | Available | URA |
| Total (Reserve List) | 4,455 | 970 | 104,750 | |||||
| Total (Confirmed List and Reserve List) | 9,200 | 970 | 188,100 | |||||
PRESS COVERAGE
20 Nov 2023
Raffles Town Club will have to vacate its premises in Plymouth Avenue when its lease ends on Oct 17, 2026, with the site slated for future residential development.
In a statement on Nov 20, the Singapore Land Authority (SLA) and Urban Redevelopment Authority (URA) said the redevelopment of the site near Stevens MRT station will support future housing demand.
The agencies said the redevelopment is in line with the Government’s focus on redeveloping brownfield sites as much as possible to meet future demand for land, including housing.

PRESS COVERAGE
20 Nov 2023
The Singapore Land Authority (SLA) and the Urban Redevelopment Authority (URA) jointly announced today that the lease for the land currently occupied by Raffles Town Club Pte. Ltd. (RTC) at 1 Plymouth Avenue will not be renewed when it expires on 17 October 2026. The land is slated for future residential development.
Site to be put for future residential use
The redevelopment of the site, which is in close proximity to the Stevens MRT interchange, for residential use will support future housing demand and enhance the residential character of the precinct, and enable future residents to benefit from the transport infrastructure and connectivity to the city and around the island. This is also in line with the focus of redeveloping brownfield sites as much as possible to meet future demand for land, including housing.
To facilitate the redevelopment plans, the lease for the land currently occupied by RTC will not be renewed upon its lease expiry. RTC can continue its operations at its current site until the lease expires on 17 October 2026, upon which RTC will be required to return the land to the State. SLA will work closely with RTC on the return of the land.
Should RTC wish to continue operations after its current lease expires, agencies will engage RTC on the availability of suitable State properties through open tender, or RTC can explore other options from the open market.
